Ho pubblicato sul manifesto del 9.10 un articolo sul fallimento di Berluscono e Bertolaso nella gestione dei rifiuti campani

Mothers volcanic won. Berlusconi, Bertolaso \u200b\u200band have lost their court of miracles. He won the hard fight. Processions and demonstrations in the repetition did not get anything, when they are burning the compactors, Terzigno jumped to center stage. A bad precedent for the government, an indication of the inevitable for those who claim to be pursued: the hope that police officers, drivers and services do not lend themselves more to act as scapegoats to blame others.


Now, in addition to the landfill Cava Vitiello, will not be even that of Serre: two sites on which the Berlusconi government had undertaken even with a law (the only case in the world where landfill sites are indicated by name by law). For this we must return to Parliament to repeal the Law 213 (transposition of the DL. 90), or a part of it, and make a new one. We hope that this time the so-called opposition does not give carte blanche to the government as it did in 2008.

But where will Berlusconi wastes that no longer has spilled Terzigno and Serre? Because the landfills Iripino Ariano and Savignano (open illegally by De Gennaro with Prodi), the Chiaiano (open Bertolaso \u200b\u200billegally) and that of Ferrandell (existing, but unused at the time of the emergency of 2008: This is to sharpen the voltage Berlusconi to win, because it is in the land of the Camorra) are almost full, you should open that the Plan of formic acid (also provided by Law 213), yet to be built, but very large, against whom at that time there already been a popular mobilization, with mayors and Vinicio Capossela enough to force Berlusconi to promise (as he tried to do too Terzigno): "Stay in the list, but it will be the last!" Now go back to being the first.

Why, out of landfills, in twenty months of extraordinary powers Bertolaso \u200b\u200bdid nothing, and what we had planned is insane. What is required by L. 213/08? Reduction policies: zero. Separate collection: to 50 percent by 2010 (the time is running out!). But who was it? Municipalities. With what? With funds from the commissioner who never made it (except in certain municipalities, who have spent well: see Salerno, passed 70-70 percent in a year). But then, once the Commissioner had decamped, the ball went to the provinces, which according to the regional law 40, as amended (in force since March 2008) would have to manage the entire waste cycle, including the collection of personal consortia, employees - since 1998 - the collection. In twenty months, a commissioner should have put the provinces who can ensure the collection: money, organization, Installation, personnel selected to assign the management of waste only one for physical and mental condition and age, for other purposes - to be agreed with the Region - the redundancies. Instead, nothing. Bertolaso \u200b\u200bis gone - and then return, along with its tricolor piping from the tee, four days ago - leaving behind the desert. On the other hand Maroni police one of the few (actually many) that separate collection, the mayors were serious, because he refused to transfer its expertise to a consortium absolutely inefficient.

Go ahead: treat the waste collected. 213 The law does not provide any facility composting audience: those that already existed, an almost ready (Tammy S.), was used by the former commissioner as "temporary storage of waste" and filled with eco-bales that are still there, the other two were not never been tested and still are not working (the virtuous community that make the collection plan are charged € 200 per tonne to send the village in the Veneto or Sicily). The law also provides for the closure of seven plants that would divide the former CDR undifferentiated residual fraction (ie a maximum of 50 percent, according to the law) in dry and wet, take it to stabilize it in a landfill without producing odors and pests of rats, insects and seagulls, and start to "termovalolorizzazione" (read: Incineration) else: no more then half of half of the waste generated each day in California (which are about 7,500 tonnes). By law, the former CDR (almost new, built with EU funds) were to be sold as scrap or processed in composting plants, if an individual, after being released from untreated organic waste accumulated for years on the lines of stabilization (miasma in which the employees were forced to work), it was assumed the risk. So?

So the entire production was destined for incineration of waste without any selection or pretreatment. Hence the law 123 provided for the construction of four incinerators in the Campania region (later became five, when Berlusconi was realized that an incinerator in "normal" the ecoballe could never be burned) with a capacity of incineration over all waste production in the region. Incineration would be funded by CIP 6 incentives: those incentives already extended in violation of European legislation for the Acerra incinerator (and thus Impregilo, the construction company, had given his pledge ecoballe as if they were barrels of oil, banks, now expect the gain promised), the same incentives that the Pd aveva poi proposto di estendere a tutti gli impianti campani (proposta subito accolta da Berlusconi).

Ma poiché gli inceneritori erano – e sono – ancora da costruire e quello di Acerra non era – e non è ancora – a norma, nel frattempo i rifiuti dovevano per forza andare in discarica; ovviamente indifferenziati, dato che gli impianti di trattamento dovevano essere chiusi. Quando si è finalmente accorto che il ferrovecchio di Acerra non avrebbe mai potuto smaltire i rifiuti giornalieri e i milioni di eco balle che gli erano destinati, Bertolaso, cambiando rotta senza cambiare la legge, ha ribattezzato “Stir” i Cdr, trasformandoli in tritattutto per sminuzzare – senza separazione – i rifiuti indifferenziati prima di mandarli in discarica o ad Acerra: “Merdaccia” chiamava questo materiale Marta Di Gennaro, la collaboratrice di Bertolaso, che li spacciava per rifiuti “stabilizzati” e che per questo era stata prima arrestata e poi salvata dalla Procura di Roma. E’ proprio il materiale contro cui sono insorti gli abitanti del Parco del Vesuvio.

Allora, siccome tutto sarebbe finito in discariche, la L. 213 ne prevedeva ben 11 (poi diventate 12), di cui: quattro in aree protette (cosa vietata da una precedente legge mai abrogata); due già costruite da De Gennaro, in aree geologicamente a rischio (infatti stanno franando) e uno in area di camorra (famiglia Schiavone), dove avrebbe arise due to the fourth incinerator. And because the rubbish leachate generated (not "arbor" as he said Berlusconi, who has confused with the compost), and the mafia puts us in all the crap he wants, Law 213 also provides that the leachate can be treated in sewage treatment plants civilians (something forbidden and dangerous) and that landfills and incinerators could accommodate industrial toxic waste, something that actually took place. In short, the management of the waste Bertolaso \u200b\u200bBerlusconi has multiplied the disaster field, leave then the hot potato in the hands of the provinces, now largely governed by the satraps of the "premier". And now, poor man, where they put the waste in order to pursue his "miracle"?

Poor bell but poor man! Now, waiting for the incinerator - that word of Berlusconi, will be built in 18 months, although they were not even designed in 30 - and stinking untreated waste will be scattered in all landfills are exhausted - but you can always try to cram a bit more - or illegal (read Camorra) from that of Giugliano, adjacent to the largest deposit of ecoballe across the galaxy. And Bertolaso, who managed to get hold of a Year Zero without adversarial Santoro, Bertolaso \u200b\u200bresume to ravage the Campania; as he did to Mary Magdalene, L'Aquila, in Giampillieri and a thousand other places. To what other moms volcanic, or plains, do not stop, once and for all.